Week 41st fix electrics & plumbing at this point followed by insulating of the loft room as per building control regulations. A site visit is required at this point.
Week 5
All external works competed, windows fitted and fully watertight.
Week 6
Opening made for staircase, staircase fitted. Loft room plastered & en-suite fitted if required.
Week 7
2nd fix all electrics, plumbing & woodwork eg skirting boards, doors. Last site inspection required. Certificate of completion obtained